EV Charger Instalation
Fast, Safe and convenient home charging
✔ Qualified electricians
✔️ Approved Installer
✔ Professional installation
Fully installed from £895
Popular EV Charger Brands & Typical Installation Costs
Every installation is slightly different depending on cable runs, access and electrical requirements. However, these are some of the most popular EV chargers and their typical fully installed price ranges:
- Zappi: £950 – £1,150
- Ohme: £850 – £1,050
- Hypervolt: £950 – £1,150
- Rolec / Budget Units: £800 – £950
We’re happy to advise on the best charger for your home, vehicle and budget.
Already Bought Your Own Charger?
We also offer an installation-only service if you’ve already purchased your EV charger.
Many customers choose to do this if:
- They’ve found a good deal online
- Their vehicle manufacturer recommends a specific charger
- They’ve already received a charger with their car
- They prefer to choose the model themselves
We’re happy to install customer-supplied units, provided they meet UK safety standards and installation requirements.
What We’ll Do
- Assess your installation requirements
- Install your charger safely and professionally
- Carry out all testing and certification
- Set up the charger and app
- Demonstrate how everything works
- Things to Be Aware Of
When supplying your own charger:
- Warranty for the unit remains with the manufacturer
- We guarantee our installation workmanship
- Some chargers may require additional parts depending on setup
- We’ll confirm everything before installation
Installation-only pricing typically from £450–£650
(Depending on installation complexity)
Our EV Charger Installation Process
At Dyneco, we make installing your EV charger simple, safe and fully compliant. Here’s what to expect from start to finish.
1. Initial Assessment - We start by assessing your property to determine the safest and most efficient installation.
We check:
- Location of your parking area
- Distance from consumer unit
- Available electrical capacity
- Cable route options
- WiFi signal (for smart chargers)
- Earthing arrangement (TN-C-S / PME / TT etc.)
- Installation accessibility
This helps us determine the best charger location and installation method.
2. Electrical Supply Check
Before installation, we check your electrical system including:
- Consumer unit type
- Main fuse rating (typically 60A, 80A or 100A)
- Available spare ways in consumer unit
- Earthing type
- Load capacity
If required, we may:
- Install load balancing
- Upgrade consumer unit protection
- Add additional protection devices
This ensures your installation is safe and compliant with regulations.
3. DNO Notification (If Required)
Depending on your installation, we may notify your Distribution Network Operator (DNO).
This is usually required if:
- Your main fuse is 60A
- Load balancing is required
- Multiple EV chargers are being installed
- Three-phase supply is involved
We handle this process for you where necessary.
4. Installation Day
On installation day, we:
- Confirm charger position
- Confirm cable route
- Protect working areas
- Install mounting bracket
- Run armoured or suitable cable
- Install isolator switch
- Install protective devices (RCBO / MCB / SPD if required)
- Connect charger
- Secure all cabling neatly
We always aim for a clean, professional finish.
5. Testing & Commissioning
Once installed, we carry out..
- Electrical testing
- Earth loop impedance tests
- RCD / RCBO testing
- Charger functionality testing
- Load testing (if required)
This ensures your installation is safe and compliant.
6. Setup & Demonstration
We then:
- Connect charger to WiFi
- Install mobile app
- Show you how to use it
- Set charging schedules
- Demonstrate smart features
You’ll be ready to charge immediately.
7. Certification & Compliance
After installation, you will receive:
- Electrical installation certificate
- Building regulations compliance (if applicable)
- Manufacturer warranty information
- Installation documentation
What We Typically Install
A standard installation usually includes:
- 7kW Smart EV Charger
- Dedicated circuit from consumer unit
- RCBO or MCB protection
- Isolator switch
- Up to 10m cable run (typically)
- Testing & certification
Typical Installation Time
- Simple installation: 3–4 hours
- Standard installation: 4–6 hours
- Complex installation: Full day
